اسلاید 1: SHUTTLE PROCESSING(Before Flight Activities Rarely Seen By The General Public)DISCOVER --- DISCOVERY
اسلاید 2: External Tank Arrives by Barge from MS
اسلاید 3:
اسلاید 4: Vertical Assembly BuildingExternal Tank
اسلاید 5: Removing External TankFrom Carrier
اسلاید 6:
اسلاید 7: External Tank Enters VAB
اسلاید 8: External Tank in VAB
اسلاید 9: Preparing to Lift the Tank to Vertical
اسلاید 10: Lifting Tank
اسلاید 11: Solid RocketsAre Attached
اسلاید 12: Engines Are Attached ToSolids
اسلاید 13: Engines Are Attached To The Shuttle In The Shuttle Processing Facility
اسلاید 14:
اسلاید 15:
اسلاید 16:
اسلاید 17: Shuttle In Sling Ready For Lift In VAB
اسلاید 18: Shuttle Has BeenMoved To VAB AndAnd Will Be AttachedTo External Tank
اسلاید 19:
اسلاید 20: Shuttle is Attached
اسلاید 21:
اسلاید 22:
اسلاید 23:
اسلاید 24: Payload Preparation Room (PPR)
اسلاید 25: Cargo Package For ISS
اسلاید 26: New Module For ISS
اسلاید 27: Payload Ready To Be Moved to The Launch Pad
اسلاید 28:
اسلاید 29: Payload Carrier Leaves PPR
اسلاید 30:
اسلاید 31: Payload Being Moved To Launch Pad
اسلاید 32:
اسلاید 33: Lifting Payload Into Position For Insertion Into Discovery When It Arrives At The Pad
اسلاید 34:
اسلاید 35:
اسلاید 36: Shuttle Discovery Leaves VAB
اسلاید 37:
اسلاید 38: Shuttle & CrawlerLaunch PadTRIP:Length--- 3 ½ miTime--- 6-8 hours
اسلاید 39:
اسلاید 40: Crawler Control
اسلاید 41:
اسلاید 42: DISCOVERY ARRIVES AT PAD
اسلاید 43:
اسلاید 44:
اسلاید 45:
اسلاید 46: READY FOR LAUNCH
اسلاید 47: We Have Lift Off