صفحه 1:
Soil and Rock
Soil and rock are the principle
components of many
construction projects.
Knowledge of their properties,
characteristics, and behavior
is important to those
associated with the design or
construction of projects.
صفحه 2:
صفحه 3:
501 2۳0 ۳۵6 2
errs 9
صفحه 4:
Soil and Rock
Steel and concrete are
construction materials that are
basically homogeneous in
composition. As such, their
behavior can be predicted. Soil
and rock are just the opposite.
By nature they are
heterogeneous. In their natural
state, they are rarely uniform.
صفحه 5:
Soil and Rock
Soil and rock are
heterogeneous. They are
rarely uniform and work
processes are developed by
comparison to a similar type
material with which previous
experience has been gained.
To accomplish this, soil and
rock types must be classified.
صفحه 6:
۳۰۳۰ 6۳۵0۵۲۱0
Soil gradation موه
is the
distribution,
in percent (%)
by weight, of
individual
particle sizes.
7 7 Silt
Mictoscopic*
Microscopic
صفحه 7:
صفحه 8:
SOIL TYPES
_@_~NON-COHESIVE
Well rounded Subrounded
Subangular Angular
Bulky shaped soil grains
صفحه 9:
SOIL TYPES
COHESIVE
TS Platy الم
Small grained shaped
Mesh sieve gojl] #200 <
arains
صفحه 10:
SOIL LIMITS
Atterburg
Limits
LL - Liquid limit
PL - Plastic limit
PI - Plasticity
_ ۲ .
صفحه 11:
SOIL LIMITS
Stages of
——-——_Consistency—________,
Plastic State 1 Liquid State
Semi-solid 0
1 Range indicatedby 5
the plastic index (PI) ۲
Pl= LL— PL 1
اا
PL
State
L
۱
0
5
Solid
State
—Meisture content decreasin
صفحه 12:
SOIL LIMITS
LL - Liquid
limit
is the water
content of a
soil when it
passes from
the plastic to
liquid state.
صفحه 13:
SOIL LIMITS
LL - Liquid limit
Non-cohesive or
sandy soils have low
LLs -- less than 20.
Clay soils have LLs
ranging from 20 to
Amr
صفحه 14:
SOIL LIMITS
PL - Liquid
limit
is the lowest
water conten
at which a soa
remains
ه06 inch diameter thread
صفحه 15:
SOIL LIMITS
PI - Plastic
Index
The hightrie Ft the
more clay that is
present in the soil.
صفحه 16:
Volumetric Measure
* Bank cubic yards (bcy)
* Loose cubic yards (Icy)
¢Compacted cubic yards
ccy)
صفحه 17:
COMPACTION
Each soil has its
particular optimum
moisture content (OMC)
at which a corresponding
maximum density can be
obtained for a given
amount of compactive
صفحه 18:
a COMPACTION
Laboratory max. dry density
8
8
Density dry soil, Ib/cf
59
x
Optimum moisture
5
|
١
t
۱
۱
1
1
|
|
1
1
108 —t
4 8 12 16
Moisture content in %
صفحه 19:
COMPACTION
| | 5'%lb. Hammer
25 Blows
per Layer PROCTOR
Compactive TEST
Effort
12,400 ft. Ibs.
Standard
Proctor
or
Soil sample a9o r-99
cubic foot
3 layers
صفحه 20:
COMPACTION
. 10 Ib, Hammer
— PROCTOR
TEST
Modified
Proctor
+; Soil sample aco
|| cubic foot -180
5 layers
صفحه 21:
COMPACTION
SPECIFICATIONS
Typically ۲
specification الا - تسب
s give an 1
acceptable ۴
range of i loptinum moisture
water
content, 5
12 16
4 8
OMC + 2% Moisture content in %
wee ی
صفحه 22:
COMPACTION
SPECIFICATIONS
140
The رز _Laboratbry max. dry density
specification *ة 126
alsosetsa i, A
minimum 2
density, 95% Bus ‘ot um moisture
of max. dry i
density fora ۴
specific test
4 8 12 16
Moisture content in %
صفحه 23:
Laboratory max. dry density
-
ع
م
بج
Density dry soil, Ib/cf
&
ص
16
Moisture content in %
صفحه 24:
Soil Weight-Volume
Relationships
Equ. 4.1
_ totalweighof soil_ W
Unitweight{y) =——— س
ae totaboilvolume ۷
Equ. 4.2
_ weighof soilsolids_W,
Dryunitweightly,) = totaboilvolume V
Equ. 4.3
Watawontental= weighof wateimsoil_W,,
weighof soilsolids W,
5
صفحه 25:
Water Content
J weighof watemsoil_ W,,
Wat بت رامین
۳60 weighof soilsolids 1
— Wet Weight Dry Weigl
Dry Weight
صفحه 26:
or 18%
Water Content
100 9
85 = 0.18
صفحه 27:
Soil Weight-Volume
Relationships
Dry weight is related to
unit weight by water
content, ۷
٩ رب
and when you move rock
and dirt the only thing
that stays constant is the
weight of the solid
صفحه 28:
Soil Weight-Volume
Relationships
When you move rock and
dirt the only thing that
stays coissthatweight
صفحه 29:
(۵
وك
© د
0
material
* unit weight 0۴ ۶
94.3 pcf
* water content (w) of
صفحه 30:
compacted to سس
۰ dry unit weight (y,) of
114 pcf
* water content (q@) of
صفحه 31:
۳ 60 ار
The net section of the
embankment is 113,000
cy.
How many cubic yards
of excavation yy
emésprikedetit 7
the
صفحه 32:
EXEROGE
As material is moved
from the excavi
3 to the compacted
“fill the only constant
is the weight of the
solid particles (y,).
صفحه 33:
GXERO1IGE Gtp 0
Weight of the solid
particles which make up
the embankment
oe ی GD of
114 pcf Dre
BL
سوه ص13
Conversion factor cy to ft?
صفحه 34:
EXERO1IGE Gtep ©
Use relationship y, - y to
calculate the dry unit
weight of the excavated
material.
* a unit weight (y) of
94.3
*a 0 (w) of
8% 17
صفحه 35:
EXEGROC1G6E 6-79
Calculate the weight of
the solid particles
which make up the
excavation (cut).
xox < 87.31 Ib/ ft?
صفحه 36:
EXGRO1GE 6-7 €
The weights must be
equal therefore:
xa «8731 10/3 -
x 1141b/ ft قل
Conversion factors cancel out.
صفحه 37:
EXEGRO1IGE Gtep €
The weights must be
equal theretore: 5; Pe
اد الط ۳
روز وو 5 9130009 16
X = 147,535 cy
excavated material
required
صفحه 38:
۶
Check the water
requirements.
Will a water truck be
needed on the job or
uy
صفحه 39:
Water content (a)
‘weighof watemsoil_ W,,
- weighofsoilsolids 7
5
@ x Yq = weight of
خم م لظا سس لس
صفحه 40:
Gtep 0
Outer Prow Out
147,535 GY Vol. Cut
x 87.31 poh.
x27 cf / C¥onversion
<x G08 = Dit Vater
صفحه 41:
Gtep 0
Outer Prow Out
147.53 cy x 87.31 pof x 27 cf ۸ ۵
= 27,825,120 lb
water
delivered with the
borrow material
صفحه 42:
Step ©
Outer ceded ot the Fil
113000 cy Vol. Emb
< 114 7 ۰
x27 cf / Cy conversion
X02 = Ib GF ieiter
صفحه 43:
مس
Oder veeded of the Pill
113.000 cyx 114 pcf x 27 cf / (yx AL
= 41,737,680 Ib
water
needed at the
fill
صفحه 44:
Step 9
Outer DePictewy
Needed at the fill
41,737,680 lb
Delivered w/ cut—____
27,825,120 lb
Water deficiency
13,912,560 Ib
صفحه 45:
PE ۶ 6 €
Ovwert to Gulows
Water deficiency
13,912,560 lb
Water weights 8.33
lb/gal
Need to add
1,670,175
صفحه 46:
Step S
Gulows per vy
Water deficiency
1,670,175 gal
Volume of cut
"Need _
دوت / ١ ریم 2 411
صفحه 47:
Adding Water
Using sprinklers to add
moisture to a foundation fill.
صفحه 48:
Reducing Moisture
+ 8 3 aay fill to reduce
۰
وعد د ولح وم موحد