صفحه 1:
Hazards And Operability Analysis (HAZOP)

صفحه 2:
When to Use HAZOP + HAZOP is a hazards identification tool. + It is best used as late as possible with a new design, in order to be as complete as possible. * With an existing facility it can be used at any time. * HAZOP can also be used for analyzing operating instructions and procedures so that sources of human error can be identified (and corrected).

صفحه 3:
Advantage * HAZOP is very thorough, because you force yourself to painstakingly examine most aspects. * HAZOP is the most widely used methodology used in the world today as a tool for hazards identification.

صفحه 4:
Disadvantage * HAZOP is very time consuming and costly ۰ ۱۲ not set up correctly and managed properly, it can be ineffective * Needs Leadership by an Expert in the field of HAZOP.

صفحه 5:
مطالعه عملیات وخطر ۲۱۵2۵۳ * مطالعه ۳۱۸20۳ معمولا در مراحل زیر از چرخه عمر سیستم انجام می شود: ”مرحله ايده وتفکر ”مرحله طراحى جزئيات ”مرحله عمليات

صفحه 6:
Basis * Simulates abnormal situations by using Guidewords applied to Parameters and Operations to create Deviations.

صفحه 7:
Methodology 1. Collect applicable documents and drawings, e.g., process flow diagrams, piping and instrument diagrams, plot plans, etc. 2. Break facility down into manageable sections ("Nodes"). Break P&IDs down into Nodes. Nodes are equipment items (or numbers of items). If nodes are too small you can loose sense of analysis and incur excessive repetition. If nodes are too large, hard to handle, becomes confusing.

صفحه 8:
Methodology 3. Prepare list of Parameters and Operations to be examined, composition, pressure, temperature, flow, etc. 4. Apply Guidewords to Parameters and Operations.

صفحه 9:
Main Guidewords * More or High or Higher or Greater than the design intent. ٠ No, None, Le ss or Low or Lower or Reduced than the design intent. * Part of or Not all of or Partially than the * design intent. * As well as or In addition to the * design intent.

صفحه 10:
Main Guidewords * Reverse or Opposite to or Instead of the design intent. * Other than or What else the design intent.

صفحه 11:
Guidewords Applied to Time (Used for BATCH and Periodic Type transfer Operations) Sooner than intended Later than intended Before what is intended After what is intended While what is intended is occurring

صفحه 12:
Applicable parameters typically include: Pressure Temperature Flow Composition Level Reaction Rate Viscosity pH

صفحه 13:
Applicable operations typically include: Filling Transferring Purging Emptying Draining Venting Maintenance Start-up Shut-down

صفحه 14:
Methodology 5. For each Node create Deviations, e.g., High pressure, High temperature, High flow, Low pressure, Low temperature, Low flow, Reverse flow, etc. 6. List and record Causes for each Deviation. 7. List and record Consequences associated with each Cause.

صفحه 15:
Methodology 8. List and record Safeguards or Controls that may prevent the Cause and for the Consequences. 9. List any future Actions or Recommendations you think should be implemented.

صفحه 16:
WOLOP Cxavple , Oowrpressor ‘let Low 3 y ‏وه وت‎ to quickly tea) vlorwe, skut-dowas 0 | ۲ ‘abet Dive | to ‏و‎ @uscuce vlorws ore equestly bypassed wad are ‏موجه ماه ام‎ | ‎@stowalie peat voutloey are oftea set fa crawl‏ أمجدف وز صا ‎ ‎ ‎weds: ‎ ‎ ‎

صفحه 17:
چم سه 0 سس ‎xin a‏ ‎foe EG‏ م د ۱۳ مس وس fase — ae 8 Op frie am ow a Sr iis eo 3 oo ‎es Raw Goes CUO 1‏ لسلسم ا ‎|1۳ 7۳۱۳۳۱۲۱۳۵13۲۳۳۲ ۲۳۳۳۳ 72۲ od wt ID" Wier the startup period ‎ ‎ ‎Oude Oni) ee ee ‏يرنه ا صصص‎ Sd ‎ ‎ ‎ ‏52 ‎GPG Dike open‏ ‎bie break.‏ ۳۳ میاه لوا امسا وات وا مرول هار موی موه انوا اس امم 0 ود ها ۰ 0 ‎release‏ مسا ۳ ۵ ۳۳۳۳ 0 ‎Athen level char WELD ston,‏ ۵ اسر سس اسر ‎ ‎ ‏۳ اس ‎Cetera Houronfice, st (8D po Thigh level, ont check he q 0‏ 0 ‎a oo‏ ماس ‎hydrocarbon‏ وتان سس سس 8 ‎1 wo ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎

صفحه 18:
۳ کارگاه عنوان:شناسایی خطر از روش ۲۱۸20۴ دستور کار:با استفاده از تکنیک ‎HAZOP‏ خطرات مثال پیوست را تجزیه و تحلیل نمائید. ملاحظات:انحرافات را بر اساس کلمات راهنما استخراج نمائید. ورودیزسناریو پیوست خروجیزیرگه تکمیل شده ثبت آنالیز ۲۱3۵200

صفحه 19:
DAP Process موی LOADING,

صفحه 20:
+ Diammonium phosphate (DAP) is made by reacting ammonia and phosphoric acid. + DAP is non-hazardous. + Ammonia is the most hazardous chemical present. 4+ Reaction is exothermic.

صفحه 21:
Phosphoric Acid Feed Line to DAP Reactor : : “Consider using a closed tank for DAP storage or ventilation. *Consider adding an alarm/shutdown of the system for low flow to the reactor. ‘Ensure that periodic = 21 maintenance 1-1- Ammonia detector and Alarm. 1-1. Unreacted Ammonia in storage tank that release to enclosed work area. 1-2. Loss of DAP production. 2-1. Same as1- 11-2. 3-1. Same as1- 11-2. 4-1-1 Periodic maintenanc 4-1. Same as1- 11-2. 1. No feed material in storage tank. No Flow 2. FIC fails high. 3. Leak or rupture of the line. 4. Control valve B fail le

صفحه 22:
Ammonia Solution Storage Tank “von ‘High Level | 7. Unloading ‘7-1. Potential | 7-1-1. Level_| “Review ammonia release of indicator on | ammonia from the ammonia to the | the storage | unloading unloading Atmosphere. tank. procedures to station without 7-12 ensure adequate space in Ammonia __| adequate space the storage tank | in the storage 8 relief valve | tank before ammonia storage tn the ‏ست‎ ‏ا‎ atmosphere. 8. Ammonia 8-1. Same as7- ‘Consider storage tank level | 1. sending the indicator fails low. relief valve discharge to a scrubber. ‘Consider adding independent high level alarm for the ammonia storage tank.

صفحه 23:
Ammonia Feed Line to the DAP Reactor “one High Flow |9.Ammonia feed | 9-1. Unreacted | 9-1- “Consider line control valve | ammonia carry | Periodic adding an A fails open. over to the DAP | maintenance | alarm/ storage tank | of valve A. | shutdown of and release to the system for the work area. high Ammonia flow to the reactor. 10. Flow indicator | 10-1. Same 10-1- fails low. as9-1. 1.Ammonia detector and Alarm. 11. Operator sets | 11-1. Same “Ensure ammonia flow rate | as9-1. periodic too high. maintenance and inspection for valve A is adequate. +Ensure adequate ventilation exist for enclosed work area and/or? consider using

صفحه 24:
Ammonia Feed Line to the DAP Reactor wee’ 14. External impact. inspection tours by operator in the DAP process area. 15. Maintenance errors.

صفحه 25:
Phosphoric Acid Solution Storage Tank “one 16. Low 16-1. 10-1 “Ensure ۱۳ Phosphoric Acid | Unreacted 1.Ammonia_| existence of ion of _ | concentration ammonia in the | detector end | adequate ic | supplied by the —_| reactor carried | Alarm. material Phosphoric | vendor. over to the DAP handling and Acid storage tank receiving and release to procedures and the work area. labeling. 17. Error in 17-1. Same “Consider charging as16-1. verifying the Phosphoric Acid to Phosphoric the supply tank Acid concentration in the storage tank before operation. + Ensure adequate ventilation exist for enclosed work area and/or consider using an enclosed DAP storage. tank.

صفحه 26:
DAP Reactor “oe 7 (Other 18. Agitator motor | 18-1. 18-1-1. *Consider Than) _| fails. Unreacted Ammonia adding an ‏ة‎ ammonia in | detector and | alarm/ ‏وده‎ the reactor Alarm. shutdown of 91 carried over to the system for the DAP loss of storage tank agitation in the and release to reactor. the work area. +Ensure adequate ventilation exist for enclosed work area and/or consider using an enclosed DAP storage tank. 19. Agitator 19-1. Same 19-1-1. Same Mechanical as18-1. as18-1-1, linkage fails. 20. Operator fails | 19-1. Same 19-1-1. Same to activate the as18-1. as18-1-1. agitator. 2

صفحه 27:
DAP Reactor Outlet line to the DAP Storage tank. _ “oe e tion ‘Reverse/ | 21. No credible No significant misdirecte | causes. effects. d flow