Project Risk Management

اسلاید 1: Project Risk Management

اسلاید 2: 2Table 11-5. Sample Risk Register / Risk AnalysisProject severity = expectation (1-10) * impact (1-10)When should risk analysis be formed?Is not a time activityPeriodic update and reviewed

اسلاید 3: 3Calculating severityProject severity = expectation (1-10) * impact (1-10)

اسلاید 4: 4Qualitative Risk AnalysisAssess the likelihood and impact of identified risks to determine their magnitude and priority.Risk quantification tools and techniques include: Probability/impact matrixesThe Top Ten Risk Item TrackingExpert judgment

اسلاید 5: 5Probability/Impact MatrixA probability/impact matrix or chart lists the relative probability of a risk occurring on one side of a matrix or axis on a chart and the relative impact of the risk occurring on the other.List the risks and then label each one as high, medium, or low in terms of its probability of occurrence and its impact if it did occur.Can also calculate risk factors:Numbers that represent the overall risk of specific events based on their probability of occurring and the consequences to the project if they do occur.

اسلاید 6: 6Figure 11-4. Sample Probability/Impact Matrix

اسلاید 7: 7Table 11-6. Sample Probability/Impact Matrix for Qualitative Risk Assessment

اسلاید 8: 8Figure 11-5. Chart Showing High-, Medium-, and Low-Risk Technologies

اسلاید 9: 9Top Ten Risk Item TrackingTop Ten Risk Item Tracking is a qualitative risk analysis tool that helps to identify risks and maintain an awareness of risks throughout the life of a project.Establish a periodic review of the top ten project risk items.List the current ranking, previous ranking, number of times the risk appears on the list over a period of time, and a summary of progress made in resolving the risk item.

اسلاید 10: 10Table 11-7. Example of Top Ten Risk Item Tracking

اسلاید 11: 11Expert JudgmentMany organizations rely on the intuitive feelings and past experience of experts to help identify potential project risks.Experts can categorize risks as high, medium, or low with or without more sophisticated techniques.Can also help create and monitor a watch list, a list of risks that are low priority, but are still identified as potential risks.

اسلاید 12: 12Quantitative Risk AnalysisOften follows qualitative risk analysis, but both can be done together.Large, complex projects involving leading edge technologies often require extensive quantitative risk analysis.Main techniques include:Decision tree analysisSimulationSensitivity analysis

اسلاید 13: 13Decision Trees and Expected Monetary Value (EMV)A decision tree is a diagramming analysis technique used to help select the best course of action in situations in which future outcomes are uncertain.Estimated monetary value (EMV) is the product of a risk event probability and the risk event’s monetary value.You can draw a decision tree to help find the EMV.

اسلاید 14: 14Figure 11-6. Expected Monetary Value (EMV) Example

اسلاید 15: 15Sensitivity AnalysisSensitivity analysis is a technique used to show the effects of changing one or more variables on an outcome.For example, many people use it to determine what the monthly payments for a loan will be given different interest rates or periods of the loan, or for determining break-even points based on different assumptions.Spreadsheet software, such as Excel, is a common tool for performing sensitivity analysis.

اسلاید 16: 16Figure 11-8. Sample Sensitivity Analysis for Determining Break-Even Point

اسلاید 17: 17Risk Response PlanningAfter identifying and quantifying risks, you must decide how to respond to them.Four main response strategies for negative risks:Risk avoidanceRisk acceptanceRisk transferenceRisk mitigation

اسلاید 18: 18Table 11-8. General Risk Mitigation Strategies for Technical, Cost, and Schedule Risks

اسلاید 19: 19Response Strategies for Positive RisksRisk exploitationRisk sharingRisk enhancementRisk acceptance

اسلاید 20: 20Residual and Secondary RisksIt’s also important to identify residual and secondary risks.Residual risks are risks that remain after all of the response strategies have been implemented.Secondary risks are a direct result of implementing a risk response.

اسلاید 21: 21Media SnapshotA highly publicized example of a risk response to corporate financial scandals, such as those affecting Enron, Arthur Andersen, and WorldCom, was legal action.The Sarbanes-Oxley Act of 2002 is considered the most significant change to federal securities laws in the United States since the New Deal.This Act has caused many organizations to initiate projects and other actions to avoid litigation.**Iosub, John C., “What the Sarbanes-Oxley Act Means for IT Managers,” TechRepublic,(March 19, 2003) (http://techrepublic.com.com/5100-6313-5034345.html).

اسلاید 22: 22Risk Monitoring and ControlInvolves executing the risk management process to respond to risk events.Workarounds are unplanned responses to risk events that must be done when there are no contingency plans.Main outputs of risk monitoring and control are:Requested changes.Recommended corrective and preventive actions.Updates to the risk register, project management plan, and organizational process assets.

اسلاید 23: 23Using Software to Assist in Project Risk ManagementRisk registers can be created in a simple Word or Excel file or as part of a database.More sophisticated risk management software, such as Monte Carlo simulation tools, help in analyzing project risks.The PMI Risk Specific Interest Group’s Web site at www.risksig.com has a detailed list of software products to assist in risk management.

اسلاید 24: 24Results of Good Project Risk ManagementUnlike crisis management, good project risk management often goes unnoticed.Well-run projects appear to be almost effortless, but a lot of work goes into running a project well.Project managers should strive to make their jobs look easy to reflect the results of well-run projects.

اسلاید 25: 25Chapter SummaryProject risk management is the art and science of identifying, analyzing, and responding to risk throughout the life of a project and in the best interests of meeting project objectives.Main processes include:Risk management planningRisk identificationQualitative risk analysisQuantitative risk analysisRisk response planningRisk monitoring and control

اسلاید 26: 26Table 11-2. Topics Addressed in a Risk Management PlanMethodologyRoles and responsibilitiesBudget and scheduleRisk categoriesRisk probability and impactRisk documentatio

29,000 تومان

خرید پاورپوینت توسط کلیه کارت‌های شتاب امکان‌پذیر است و بلافاصله پس از خرید، لینک دانلود پاورپوینت در اختیار شما قرار خواهد گرفت.

در صورت عدم رضایت سفارش برگشت و وجه به حساب شما برگشت داده خواهد شد.

در صورت بروز هر گونه مشکل به شماره 09353405883 در ایتا پیام دهید یا با ای دی poshtibani_ppt_ir در تلگرام ارتباط بگیرید.

افزودن به سبد خرید